Click to view details.... Click to view details.. Click to view details.... Click to view details.... TERApro- the professional software
 

image
image
Bandra-Worli Sea Link Project: Benefits
image
Location & Purpose Project Planning & Cost Span & Structural Arrangement  Construction Highlights

Trivia

Benefits

image

  • Savings in vehicle operating cost to the tune of Rs.100 crores per annum (1999 yr base) due to reduction in congestion in the existing roads and lower vehicle operating cost on the bridge. 
  • Considerable savings in travel time (20-30 min) due to increased speed and reduced delays at intersections at existing roads 
  • Ease in driving with reduced mental tension and overall improvement in the quality of life.
  • Reduction in traffic on existing roads because of traffic diversion to sea link 
  • Improvement in environment especially in terms of reduction in carbon monoxide, oxides of nitrogen and reduction in noise pollution in areas of Mahim, Dadar, Prabhadevi and Worli. 
  • Project to have no adverse effect on fisheries, marine life and livelihood of fisherman. 
  • Reduced accidents 
  • Proper landscaping measures along the approaches and promenade along waterfront to enhance environment of the area
Previous Next
image
blog comments powered by Disqus
References:
1. www.bandraworlisealink.com
2. http://www.cranestodaymagazine.com
3. A Critical Analysis of Bandra-Worli Cable Stayed Bridge, Mumbai by C.S.W. Davies
4. Report on Cable Stayed bridges by Ravi Haldania, Dept of Civil Engineering, IIT-Powai.
5. http://en.wikipedia.org/wiki/Bandra-Worli_Sea_Link
6. http://sea-link.blogspot.com/
7. News items from Times of India, DNA
image
 

ConcreteBasics.org's Newsletter
* indicates required
Question-Answer forum
Submit an article
Photo Gallery