|
|
(i) During the launching process the leading edge of
the superstructure is subject to a large hogging moment.
In this connection, steel launching nose typically about 0.6-0.65 times span length is provided at the leading
edge to reduce the cantilever moment.
|
Sometimes, instead of using launching nose
a tower and stay system are designed which
serves the same purpose.
(ii) The superstructure
continually experiences alternative sagging and hogging moments during incremental launching. Normally, a central prestress is provided
in which the compressive stress at all points of bridge cross section is equal.
In this way, it caters for the possible occurrence of tensile stresses in upper
and lower part of the cross section when subject to hogging and sagging moment respectively.
Later when the whole superstructure
is completely launched, continuity prestressing is performed in which the location
and design of continuity tendons are based on the bending moments in final completed
bridge condition and its provision is supplementary to the central prestress.
(iii) For very long
span bridge, temporary piers are provided to limit the cantilever moment.
*
* * * *